Bangladesh’s first hybrid solar-wind tower in Hatiya
Integrated telecom infrastructure services company edotco Bangladesh has built a 75-metre hybrid solar-wind tower in Hatiya, a remote cyclone-prone island located to the north of the Bay of Bengal, where no commercial power connection is available
Integrated telecom infrastructure services company edotco Bangladesh has built a 75-metre hybrid solar-wind tower in Hatiya, a remote cyclone-prone island located to the north of the Bay of Bengal, where no commercial power connection is available.
The tower consists of an in-built green hybrid energy solution with a capacity to produce 42 kilowatts per day from 12-kilowatt solar panels and 6 kilowatt per day from 4-kilowatt wind turbines mounted on the tower to ensure round-the-clock power supply, keeping the telecom system operating throughout the year.
The renewable energy solution not only helps decrease operating expenses by reducing diesel consumption and maintenance costs, but also reduces carbon emissions by up to 80 per cent, the company said in a statement.
"As a socially responsible company, edotco implements initiatives in communities across the nation irrespective of their location or economic condition," said Ricky Steyn, country managing director of edotco Bangladesh.
https://www.thedailystar.net/business/news/edotco-deploys-bangladeshs-first-hybrid-solar-wind-tower-hatiya-1954465
Post a Comment